Lomas Verdes
High School
Lomas Verdes HS was a true start to finish project. Everything from the foundation to the final finishes.
- Date: 13 August 2017
- Square Footage: 78,953
- Project Type: New Construction
About this Project
Managed many different teams, weekly schedules, budgets, quality of work, design teams and final spec demands. This project took 2 years to complete and included the following types of materials:
- Concrete slab, durock and cancellery facades
- Steel structure, steel slab, ceramic floors
- Gypsum ceilings, large glass windows with aluminum frames
- Tempered glass railings, marble stairs and natural stone floors
![1.1](https://todoshomes.com/wp-content/uploads/2022/02/1.1.jpg)
![2.1](https://todoshomes.com/wp-content/uploads/2022/02/2.1-1024x768.jpg)
![3.1](https://todoshomes.com/wp-content/uploads/2022/02/3.1-scaled.jpg)
![3.2](https://todoshomes.com/wp-content/uploads/2022/02/3.2.jpg)
![4.1](https://todoshomes.com/wp-content/uploads/2022/02/4.1-scaled.jpg)
![4.2](https://todoshomes.com/wp-content/uploads/2022/02/4.2.jpg)
![20170812_104851](https://todoshomes.com/wp-content/uploads/2022/02/20170812_104851.jpg)
![2.4](https://todoshomes.com/wp-content/uploads/2022/02/2.4.jpg)
![20170811_113244](https://todoshomes.com/wp-content/uploads/2022/02/20170811_113244.jpg)
![6.1](https://todoshomes.com/wp-content/uploads/2022/02/6.1-scaled.jpg)
![6.2](https://todoshomes.com/wp-content/uploads/2022/02/6.2-scaled.jpg)
![20170813_170257](https://todoshomes.com/wp-content/uploads/2022/02/20170813_170257-rotated.jpg)
![20170813_170140](https://todoshomes.com/wp-content/uploads/2022/02/20170813_170140-rotated.jpg)
![5.3](https://todoshomes.com/wp-content/uploads/2022/02/5.3-scaled.jpg)