City Express
City Express…
- Date: 13 August 2017
- Square Footage: 78,953
- Project Type: New Construction
About this Project
Managed many different teams, weekly schedules, budgets, quality of work, design teams and final spec demands. This project took 2 years to complete and included the following types of materials:
- Concrete slab, durock and cancellery facades
- Steel structure, steel slab, ceramic floors
- Gypsum ceilings, large glass windows with aluminum frames
- Tempered glass railings, marble stairs and natural stone floors
![2b](https://todoshomes.com/wp-content/uploads/2022/05/2b-scaled.jpg)
![4b](https://todoshomes.com/wp-content/uploads/2022/05/4b-scaled.jpg)
![5a](https://todoshomes.com/wp-content/uploads/2022/05/5a-scaled.jpg)
![5b](https://todoshomes.com/wp-content/uploads/2022/05/5b-scaled.jpg)
![1](https://todoshomes.com/wp-content/uploads/2022/05/1-scaled.jpg)
![3a](https://todoshomes.com/wp-content/uploads/2022/05/3a-scaled.jpg)
![2b](https://todoshomes.com/wp-content/uploads/2022/05/2b-1-scaled.jpg)
![3b](https://todoshomes.com/wp-content/uploads/2022/05/3b-scaled.jpg)